How to quote carpentry and cabinet work in South Africa
Custom carpentry is quoted from a drawing the client has agreed, because the cost is made in the workshop before anyone sees it installed. Sign off dimensions and finishes in writing, price boards and hardware separately from labour, take a deposit that covers the materials, and say how long the order will take. This guide works through a built-in cupboard.
On this page: quote from a signed-off drawing · four costs in custom work · a worked example · deposit for custom work · VAT · questions
Quote from a signed-off drawing
Measure on site, draw it, and get the client to accept the drawing with its dimensions, board finish, edging, door style and hardware. A change after the boards are cut is a cost, not a favour, so the quote should say that changes after sign-off are priced separately. Photos of the wall, floor and any obstacles (pipes, sockets, uneven walls) go with the drawing.
The four costs in custom work
- Boards and edging: priced from the cutting list, including offcuts you cannot reuse.
- Hardware: hinges, runners, handles and fixings, which can be a large share of the price for cabinets.
- Workshop time: cutting, edging, assembly and finishing.
- Delivery and installation: including making good where the unit meets the wall.
A worked example: a built-in cupboard
| Item | Qty | Price | Total |
|---|---|---|---|
| Boards, edging and backing, cut to the drawing | materials | R7,200 | R7,200 |
| Hinges, runners and handles | hardware | R1,850 | R1,850 |
| Workshop time: 4 days | 4 days | R700 | R2,800 |
| Delivery and installation: 1 day, 2 people | 2 person-days | R650 | R1,300 |
| Subtotal | R13,150 | ||
| VAT at 15% (if you are VAT-registered) | R1,972.50 | ||
| Total | R15,122.50 |
The example uses invented prices, to show the layout and the arithmetic. Use your own rates and costs. Add the lead time ("ready for installation about two weeks after the deposit and the signed drawing") and the exclusions: painting the wall behind, electrical work, and changes after sign-off.
The deposit for custom work
Boards cut to a client's drawing cannot be sold on, so take a deposit that at least covers the materials and hardware before you order or cut, and put the balance due on installation. Write the deposit terms on the quote and on the invoice: see invoice payment terms. Have the client accept the quote in writing: acceptance wording has copy-paste text.
VAT
Add 15% only if you are VAT-registered, which is compulsory once your taxable supplies pass R2.3 million in 12 months. If you are not registered, the price you quote is the price, and the quote should say so. See whether you need to register.
Turn this into a quote in two minutes
Describe the job and your prices in plain words and Zuvo drafts the quote with line items and VAT in rand. Check it, send it, and the client can accept online.
Try Zuvo free for 14 days, no cardGeneral guidance with an illustrative example, not legal or technical advice. checked on 21 November 2026.
Questions people ask
What should a carpentry quote include?
The drawing and dimensions, board and finish, edging, hardware, workshop time, delivery and installation, the lead time, what is excluded, the deposit and balance terms, VAT, and a valid-until date.
How do I quote a custom cupboard?
Measure on site, draw it, and get the drawing signed off. Price boards and edging from the cutting list, hardware separately, then workshop time and installation. State that changes after sign-off are priced separately.
How big a deposit should I take on custom carpentry?
At least enough to cover the materials and hardware before you order or cut, because made-to-measure boards cannot be sold on. The amount is for you and the client to agree and write on the quote.
What if the client changes the design after I start?
Say on the quote that changes after the drawing is signed off are priced separately, and send each change as a short quote that the client accepts before you continue.
Should I show hardware as a separate line?
Yes. Hinges, runners and handles are a large and variable part of a cabinet's cost, and showing them separately explains the price.