How to quote handyman jobs in South Africa
Handyman work is lots of small jobs, and the risk is that each one is too small to quote properly. The fix is a list: each job on its own line with its own price, a minimum charge so a quick visit still pays, and materials either priced or bought at cost with receipts. This guide works a five-job visit through.
On this page: quote as a list, one job per line · set a minimum charge · materials · a worked example · ask for photos before you commit · VAT · questions
Quote as a list, one job per line
A client with six small jobs wants one visit and one number. Walk through with them, write each job as its own line, and price each one. The list protects you both: nothing is forgotten, and a job added later is a new line with a new price, not an argument about whether it was "included".
Set a minimum charge
Travel and set-up cost the same for a ten-minute job as for a two-hour one. Decide the smallest visit you will do, whether that is a half-day or a fixed minimum, and state it on the quote. For batches of jobs, a day rate with a list of what you expect to finish in the day also works.
Materials: price them or buy at cost
- Price them in: estimate the materials per job and include them in each line.
- Buy at cost: say you will buy what is needed, show the receipts, and charge at cost plus any markup you have agreed. Tell the client the markup before you buy.
- Client supplies: write "client supplies the lock" on the line, and that you are not responsible for the item they bought.
A worked example: five jobs in one visit
| Item | Qty | Price | Total |
|---|---|---|---|
| Fix leaking basin tap (washer and seat) | 1 | R350 | R350 |
| Hang three shelves | 3 | R180 | R540 |
| Replace front door lock, client supplies lock | 1 | R280 | R280 |
| Reseal shower with silicone | 1 | R450 | R450 |
| Repair gate hinge and re-hang gate | 1 | R380 | R380 |
| Materials bought for the above (at cost, receipts shown) | lump sum | R260 | R260 |
| Subtotal | R2,260 | ||
| VAT at 15% (if you are VAT-registered) | R339 | ||
| Total | R2,599 |
The example uses invented prices, to show the layout and the arithmetic. Use your own rates and costs. Under the list, add: a minimum visit charge, that extra jobs are quoted as they are added, and that the price assumes access to each area when you arrive.
Ask for photos before you commit
A photo of each job before you quote catches the "small" repair that is actually a rotten frame or a hidden leak. Ask for photos, and say that a price given from photos is an estimate until you have seen the job, then confirm it in writing.
VAT
Add 15% only if you are VAT-registered, which is compulsory once your taxable supplies pass R2.3 million in 12 months. If you are not registered, the price you quote is the price, and the quote should say so. See whether you need to register.
Turn this into a quote in two minutes
Describe the job and your prices in plain words and Zuvo drafts the quote with line items and VAT in rand. Check it, send it, and the client can accept online.
Try Zuvo free for 14 days, no cardGeneral guidance with an illustrative example, not legal advice. checked on 21 November 2026.
Questions people ask
How do I quote several small jobs at once?
List each job on its own line with its own price, add the materials, and give one total. A job added later becomes a new line with a new price.
What should a handyman's minimum charge be?
Whatever makes the smallest visit worth your time after travel and set-up: a fixed minimum or a half-day. State it on the quote and decide it yourself.
Should I add a markup on materials?
You can, if you tell the client the markup before you buy and show the receipts. Alternatively price the materials into each line. Either way, be clear about which you are doing.
Is a quote from photos binding?
Treat a price from photos as an estimate until you have seen the job. Say so, and confirm the price in writing after the visit.
Should a handyman quote or estimate?
For a defined list of small jobs, quote a fixed price per job. For repairs where the cause is unknown, give an estimate and say it will be confirmed once you have opened it up.